EECA 2024
EECA 2024 compliance
The Energy Efficiency and Conservation Act 2024 sets deadlines for sites that use a lot of energy. We handle each step for you: the energy manager, the energy audit, the energy management system and the yearly report.
Current sensors on the busbars of a distribution panel, feeding a power logger during an audit.
Registered ESCO
Work delivered under
EECA 2024 · Suruhanjaya Tenaga
Audits to
GP/ST/No.49/2024 (Pind. 1/2026) · ASHRAE Level II · ISO 50002-1
Reports signed by
Registered Energy Auditor · JTB-2025-0063/002
Does the Act apply to you?
The Act has applied since 1 January 2025. It covers a site that uses 21,600 GJ of energy or more in any twelve consecutive months, in one place. All the energy types the Act covers are counted, not electricity alone. If it were all electricity, 21,600 GJ is 6 million kWh, or about 500,000 kWh a month.
Suruhanjaya Tenaga decides who is covered. It sends a written notice, and the notice starts the clock.
Not sure where your site stands? The free checker at eeca2024.my shows how close you are to the threshold.
Already have a notice? Go to the deadlines below.
Act 861, ss. 3(1), 3(3), 3(5). Energy Efficiency and Conservation Regulations 2024, reg. 3.
After the notice: what is due, and when
Enter the date on your notice. The chart shows each deadline. Some deadlines run from the notice. Others run from the day your energy manager is appointed, so appointing early brings them forward.
Each bar ends at its deadline, marked by the ring. The orange bar is the first yearly report; it then repeats every year. Drawn for a manager appointed on the last day allowed: appoint earlier and the system and yearly-report clocks move earlier with it.
After your first audit report, you can apply to skip the next one. You apply in the first three months of the fifth year, and you must show that your measures have improved your energy efficiency. The Commission decides.
Office buildings have one more duty. If your building receives a building notice, you apply for an energy intensity label within 30 days after one year from that notice, then every year. From the fifth year, the building must rate at least two stars. → Energy intensity label
Regulations 2024, regs. 4(2), 6(1), 8, 9, 10(1), 10(2), 11(2), 11(6), 12. Act 861, s. 9(3) to (5).
Who can be your Registered Energy Manager
One of your own employees who is registered, or an external manager for up to three years from the notice. When the three years end, the appointment goes to one of your own staff.
An external manager must be Type II. So must any manager, in-house or external, where the site uses more than 50,000 GJ in twelve months.
We provide external Type II managers, and can prepare one of your staff to take over.
Regulations 2024, regs. 4, 5, 6, 14.
What happens if a step is missed
The Act sets a maximum fine for each duty. Most fall on the company. Two fall on the REM personally.
| If this is missed | Who can be fined | Up to |
|---|---|---|
| Appointing a REM | The company | RM50,000 |
| Developing the EnMS on time, or putting it in place | The company | RM50,000 |
| Following the Commission’s EnMS guidelines | The company | RM20,000 |
| Submitting the EE&C report | The company | RM50,000 |
| Appointing a Registered Energy Auditor | The company | RM50,000 |
| Submitting the energy audit report | The company | RM50,000 |
| Telling the Commission within 14 days that the REM post is empty | The company | RM10,000 |
| Carrying out the REM’s duties under the Act | The REM | RM20,000 |
| Preparing the EE&C report | The REM | RM20,000 |
In November 2026 the Commission said it will step up enforcement, starting with the three-month deadline to appoint a REM.
Act 861, ss. 5(3), 5(4), 6(3), 6(4), 7(3), 7(4), 8(4), 9(10). Regulations 2024, reg. 7(4). Enforcement: Suruhanjaya Tenaga, reported by Bernama, 12 November 2026.
What it means for the business
The Act reaches a small number of large sites that use most of the energy. The Ministry estimates it covers about 4.3% of industrial energy users, who use about 66% of industrial energy, and about 0.04% of commercial users, who use about 21% of commercial energy.
The bill. A measured baseline shows which measures pay back and which do not. In one government office complex we audited, 16 measures added up to about RM282,000 a year.
The report. The same measured data supports ISO 50001 and your Scope 1 and Scope 2 emissions figures. For the largest listed companies, reasonable assurance of those figures is required for reporting periods from 2028.
Carbon tax. Deferred, with no new date set.
Ministry of Energy Transition and Water Transformation (PETRA), media statement, 4 December 2024 (estimates). Office complex figures from our audit report for that site. Securities Commission Malaysia, 17 September 2026 (Group 1 entities). Carbon tax: minister’s statement reported by Bernama and The Star, 5 October 2026.
Where the building rules are going
Today the building rules apply to office buildings. In November 2026 the Commission said it expects to extend them to other buildings, including shopping complexes, hospitals, hotels and data centres, in a later phase. No dates have been set in the regulations.
Suruhanjaya Tenaga, reported by Bernama, 12 November 2026.
The grant
SEDA has not yet announced the next cycle of its energy audit grant (EACG). Where a grant is open, we can help you apply, subject to availability, eligibility and terms and conditions. Our audit does not depend on it.
The source documents
Read the Act, the Regulations and the Commission’s guidelines. → Official documents
Updates on the rules, as they change. → Insights
Send us the date on your notice.
We will send back your deadlines and tell you what to do first.
We use these details to reply to your enquiry. See our Privacy Notice.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Emaileco@innovast.asia
Phone+60 12 355 6214
OfficeSuite A-5-1, Plaza Mont’ Kiara, 2 Jalan Kiara, Mont’ Kiara, 50480 Kuala Lumpur
The first look costs nothing.
01
Preliminary audit
Your bills, your asset list and a walk-through of the site. About two weeks.
No fee
02
A straight answer
What is worth measuring, what is not, and roughly what it could save. If nothing needs doing, we say so.
03
Measured audit
Loggers on the systems that matter, for 7 to 14 days. Then the signed report.
04
Fix and verify
Your contractors or a performance contract do the work. We verify the savings to IPMVP.
A detailed audit logs on site for 7 to 14 days. The report follows about a month after fieldwork. From order to final report, most jobs take 3 to 5 months, including your reviews.
SEDA has not yet announced the next cycle of its energy audit grant (EACG). Where a grant is open, we can help you apply, subject to availability, eligibility and terms and conditions. Our audit does not depend on it.