Audit and measurement support for ESCOs

We do the measuring, the analysis and the reports behind your engagement. You keep the client.

SUTO clamp-on ultrasonic flow meter kit in its transit case, showing the transmitter, transducer leads, mounting straps and acoustic coupling compound

Our clamp-on ultrasonic flow meter, with its transducers, straps and coupling compound.

Registered ESCO

Work delivered under

EECA 2024 · Suruhanjaya Tenaga

Audits to

GP/ST/No.49/2024 (Pind. 1/2026) · ASHRAE Level II · ISO 50002-1

On the team

Registered Energy Auditors and REM Type II

What we do for you

We take a whole job, or one part of it.

  • Site logging of power, flow and temperature, with our own instruments
  • Analysis of the logged data and the energy bills
  • Energy audits, including the audit report under EECA 2024, prepared by a Registered Energy Auditor
  • M&V baselines and plans to IPMVP
  • An independent review of your own baseline or savings figures, before your client sees them
  • A review of an audit report prepared by another firm
  • An external REM Type II, where your client needs one

Reports can go out in your format, with your logo, or in our neutral template for you to brand. Under the Act, the energy audit report is prepared by the Registered Energy Auditor appointed for the audit, and the EE&C report by the Registered Energy Manager. Their names and registration numbers go with the work, whatever logo is on the cover.

Act 861, ss. 7(1), 8(2), 9(1).

Rogowski coils, voltage leads and insulating gloves packed for one switchboard

Rogowski coils, voltage leads and insulating gloves, packed for one switchboard.

How we work with you

We sign an NDA with you before we see any client details. We do not approach your client about that site, or offer them our services there, unless you agree in writing. We do not show your jobs on our website or in our decks while they are running, and we never show your name or your client’s name.

We do not sell energy-saving equipment. On a performance contract, the savings guarantee stays with the contracting ESCO.

The method is agreed before we start, our fee does not depend on the result, and we report what the data shows. Our verification reports say who engaged us, so the owner knows where a review came from.

Who does the work

Our team has audited more than 60 facilities, counting work our engineers did before joining Innovast: 32 manufacturing and industrial sites, 6 hotels, 6 office towers and shopping malls, 5 water and wastewater plants, 4 pharmaceutical plants, 4 hospitals, 3 government office buildings, 2 universities and 2 oil and gas terminals.

Innovast Sdn Bhd is a Registered ESCO with Suruhanjaya Tenaga (ESCO 327(2023)/76/2024), with Registered Energy Auditors (REA) and Registered Energy Managers (REM) on staff.

Meet the team →

Two clamp-on ultrasonic flow transducers fitted to a white insulated chilled water pipe, insulation opened at each transducer position

Clamp-on ultrasonic transducers on a chilled water pipe. Logged in place, no pipe penetration.

How to start

  1. Send us your client’s scope or tender document.
  2. We reply with a scope, a timeline and our price for you.
  3. We sign the NDA and start.

Rates for ESCO and consultant work are on application.

Send us the scope.

We reply within one business day.

We use these details to reply to your enquiry. See our Privacy Notice.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Emaileco@innovast.asia

Phone+60 12 355 6214

OfficeSuite A-5-1, Plaza Mont’ Kiara, 2 Jalan Kiara, Mont’ Kiara, 50480 Kuala Lumpur

The first look costs nothing.

01

Preliminary audit

Your bills, your asset list and a walk-through of the site. About two weeks.

No fee

02

A straight answer

What is worth measuring, what is not, and roughly what it could save. If nothing needs doing, we say so.

03

Measured audit

Loggers on the systems that matter, for 7 to 14 days. Then the signed report.

04

Fix and verify

Your contractors or a performance contract do the work. We verify the savings to IPMVP.

A detailed audit logs on site for 7 to 14 days. The report follows about a month after fieldwork. From order to final report, most jobs take 3 to 5 months, including your reviews.

SEDA has not yet announced the next cycle of its energy audit grant (EACG). Where a grant is open, we can help you apply, subject to availability, eligibility and terms and conditions. Our audit does not depend on it.