EECA 2024 compliance
Registered Energy Manager (Type II) for your site
A notice under EECA 2024 gives you three months to appoint a Registered Energy Manager. If nobody on your staff is registered, we assign a Type II manager for up to three years, and train one of your people to take over.
Power meters in weatherproof enclosures, set up for a multi-point audit.
Registered ESCO
Work delivered under
EECA 2024 · Suruhanjaya Tenaga
Audits to
GP/ST/No.49/2024 (Pind. 1/2026) · ASHRAE Level II · ISO 50002-1
Reports signed by
Registered Energy Auditor · JTB-2025-0063/002
What the regulations say
The default is one of your own employees. An external manager is the fallback, and only for a limited time.
| Rule | What it means |
|---|---|
| Reg. 4(2) | Appoint one of your own employees within three months of the notice. |
| Reg. 6(1), 6(4) | An external manager is allowed for up to three years from the notice, and must be Type II. After that, the appointment goes back to an employee. |
| Reg. 6(3) | One external manager can serve no more than seven other energy consumers. |
| Reg. 5 | Above 50,000 GJ over twelve months, the manager must be Type II. |
| Reg. 7 | If the post falls vacant, tell the Commission within 14 days (fine up to RM10,000) and appoint again within three months. |
Your three years start at the notice, not at the appointment. If procurement takes eight months, an external manager has about two years and four months left.
This is one part of EECA 2024. The full timeline, the audit and the fines →
What the manager does
Collects and analyses the energy data, makes sure the energy management system is in place and monitored, prepares the yearly report, and advises on further savings (Act 861, s. 5(2)). The manager is personally liable, with a fine of up to RM20,000 (s. 5(4)).
Your people run the site. Our manager attends, reads the numbers and signs what must be signed, and we prepare and check the work behind it.
Two clocks. The audit report runs from the notice: due within a year, then every five years. The energy management system and the yearly report run from the date you appoint the manager. Energy management and reporting →
Four power meters in one enclosure, logging four feeders at the same time.
Our fees
| Level | What it includes | From |
|---|---|---|
| Quarterly attendance | Four site visits and four review meetings a year, the yearly report prepared and filed on time, the energy management system monitored, and letters to Suruhanjaya Tenaga handled. One installation, minimum 12 months. | RM3,500 a month |
| Monthly attendance | Twelve site visits and four review meetings a year, with monthly follow-up. One installation, minimum 12 months. | On scope |
| Full EECA 2024 compliance package | The Detailed Energy Audit, the energy management system built and handed over, and the submission to Suruhanjaya Tenaga, per installation. The manager is priced separately. | RM60,000 commercial RM100,000 industrial |
Priced per installation. Starting points, not quotations; final scope and fee follow the preliminary audit. Where the site uses 100,000 kWh a month or more, SEDA’s EACG grant can part-fund the audit, but not the manager or the system. SEDA has not yet announced the next cycle. Where a grant is open, we can help you apply, subject to availability, eligibility and terms and conditions. Our audit does not depend on it.
All figures are for Peninsular Malaysia. Work in Sabah and Sarawak falls under separate registrations and is not quoted here.
Where we have done this
Most of our work is under non-disclosure, so each job is described by type of facility.
| Facility | What we did | Our role |
|---|---|---|
| Pharmaceutical plant, Selangor | Detailed energy audit under SEDA EACG, and a 26-point energy monitoring system across three production buildings. | Direct |
| Government office complex, Putrajaya | Energy audit, measured on site. Report presented and approved by the client, November 2026. Innovast was the technical audit team. | Partner engagement |
Sectors: manufacturing and industrial, pharmaceutical, office towers, shopping malls, hotels, hospitals, government buildings, universities, water and wastewater, oil and gas terminals.
Related pages
- EECA 2024 compliance: the deadlines, the manager and the fines.
- Energy management and reporting: the system and the yearly report.
- Energy audits: every audit, the method and the fees.
- EECA 2024 documents: the Act, the Regulations and the guidelines.
Tell us about your site.
A factory, a tower or a portfolio. An engineer will reply.
We use these details to reply to your enquiry. See our Privacy Notice.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.
Emaileco@innovast.asia
Phone+60 12 355 6214
OfficeSuite A-5-1, Plaza Mont’ Kiara, 2 Jalan Kiara, Mont’ Kiara, 50480 Kuala Lumpur
The first look costs nothing.
01
Preliminary audit
Your bills, your asset list and a walk-through of the site. About two weeks.
No fee
02
A straight answer
What is worth measuring, what is not, and roughly what it could save. If nothing needs doing, we say so.
03
Measured audit
Loggers on the systems that matter, for 7 to 14 days. Then the signed report.
04
Fix and verify
Your contractors or a performance contract do the work. We verify the savings to IPMVP.
A detailed audit logs on site for 7 to 14 days. The report follows about a month after fieldwork. From order to final report, most jobs take 3 to 5 months, including your reviews.
SEDA has not yet announced the next cycle of its energy audit grant (EACG). Where a grant is open, we can help you apply, subject to availability, eligibility and terms and conditions. Our audit does not depend on it.